
Conceptual Design Report, February 2010
This Conceptual Design Report presents the vision, process and preliminary design for the Portland-Milwaukie Light Rail Project as of February 2010. It is a culmination of community input and the discussions between and decisions made by project partners and stakeholders. Concepts and recommendations put forth in this report will help guide the project in the Final Design phase.
Report
- Conceptual Design Report Executive Summary and Introduction (3.3 MB PDF)
- Innovation Quadrant (8.7 MB PDF)
Lincoln Street, South Waterfront and OMSI station areas; Harbor structure; Willamette River Bridge - Neighborhoods/Employment Segment (4.7 MB PDF)
Clinton Street, Rhine Street and Holgate Boulevard station areas - Neighborhoods/Recreation Segment (5.6 MB PDF)
Bybee Boulevard station area; Tacoma Street station area and Park & Ride; Tillamook Branch structure - Downtown Milwaukie (2.7 MB PDF)
Downtown Milwaukie station area - Green Gateway/Multi-Modal Segment (4.2 MB PDF)
Park Avenue station area and Park & Ride; Kellogg Creek Bridge; Trolley Trail - Future Harold Station (52 KB PDF)
Future development designation factors - System Elements and Preliminary Engineering Recommendations (651 KB PDF)
Station Furnishings, Equipment and Signage; Public Art, Sustainability; Transit Operations; Traffic Management; Safety and Security; Bicycle, Pedestrian and ADA Accessibility; Right-of-Way Displacement and Relocation; Budget; Project Schedule
Appendices
A. Portland-Milwaukie Light Rail Station Area Best Practices, Assessments and Recommendations--Metro: September 2009
- Introduction (2.2 MB PDF)
- Part 1--Portland Stations (12 MB PDF)
- Part 2--Milwaukie and North Clackamas County Stations (11 MB PDF)
- Appendix (9.6 MB PDF)
B. 2009 Public Meetings Log--TriMet (333 KB PDF)
C. Portland-Milwaukie Light Rail Project: Summary of Relevant Public and Private Planning Documents (118 KB PDF)
D. Exhibit C: Post Locally Preferred Alternative (LPA) Recommendations--A memorandum from the City of Portland to TriMet (18 KB PDF)
E. A Memorandum of Understanding between TriMet and the City of Milwaukie (476 KB PDF)
F. Portland-Milwaukie Light Rail Project Supplemental Draft Environmental Impact Statement--Metro: May 2008
- Executive Summary (11 MB PDF)
- Table of Contents (1.43 MB PDF)
- Chapter 1 (15.9 MB PDF)
- Chapter 2 (8.15 MB PDF)
- Chapter 3 (17.8 MB PDF)
- Chapter 4 (5.85 MB PDF)
- Chapter 5 (4.99 MB PDF)
- Chapter 6 (4.68 MB PDF)
- Appendices A–E (8.26 MB PDF)
- Appendices F–L (12 MB PDF)
- Public Comment Report 06/25/08 (25.6 MB PDF)
G. Portland-Milwaukie Light Rail Project: Willamette River Bridge Type Selection Process--TriMet: February 2009 (1.2 MB PDF)
H. Portland-Milwaukie Light Rail Project Locally Preferred Alternative Report--Metro and TriMet: July 24, 2008 (2.9 MB PDF)








